About

생활속의 위성항법, 보다 안전하게 제공하겠습니다!

Pohang eLoran/Loran-C station

Station name: Pohang eLoran/Loran-C Station (PH)
The Pohang eLoran/Loran-C Station plays the role of a master station (9930-M) for the Korea Chain. Built in 1979 by the US Air Force, the Pohang eLoran/Loran-C Station is currently operated by the Pohang Maritime Radio Beacon Center under the NMPNT of the Ministry of Oceans and Fisheries.

The Pohang eLoran/Loran-C Station performs various tasks including repairing and testing the Loran-C system in South Korea, maintaining and repairing integrity monitoring stations (IMS), and measuring Loran signals. It also supports the monitoring and control, as well as network maintenance and repair work for Okcheon Control Station

Pohang eLoran/Loran-C Station’s Tasks

  • 01
    • Serve as the master station of the Korea Chain
  • 02
    • Detect radio signals from each transmission station in the Korea Chain
  • 03
    • Analyze the operational status of Loran-C transmission stations in South Korea and make adjustments accordingly
  • 04
    • Operate, manage, maintain, and repair the Korea Chain Ganjeolgot Integrity Station
  • 05
    • Operate, manage, maintain, and repair transmission station facilities and equipment
  • 06
    • Handle business contact with international maritime radio beacon organizations and cooperate with them

Facilities & Equipment

Pohang eLoran/Loran-C Station Facilities & Equipment
Category Name Place Purpose Others
Operation equipment RCU control and communication system Operation center Control ACCUFIX 6500 RCU and control communication with domestic and international Korea Chain transmission stations  
Transmit IMS data Operation center Transmit signals received from IMS to Okcheon Control Station  
Monitor Chain signals Operation center Monitor and control the Korea Chain signals  
Monitor supplementary facilities Operation center Monitor conditions of supplementary facilities such as temperature, status, fire alarm, etc.  
Monitor transmission signals in Pohang Operation center Monitor signals transmitted by the Pohang eLoran/Loran-C Station in real time  
Transmission equipment ACCUFIX 6500 transmitter Transmission room Transmit Loran signals  
Antenna -  
Supplementary facilities Constant temperature and humidity chamber Transmission room Maintain adequate temperature in the transmission room  
Emergency power generator Generator room Supply power when commercial power is cut off  
Power supply facility Switchboard room Use for high and low voltage  
Uninterrupted Power Supply (UPS) Switchboard room Supply rated power  
Monitoring devices ACCUFIX 520 Receiver Transmission room Installed in the Korea Chain Pyeongtaek Integrity Station  
URSANAV Receiver (UN-152B) Transmission room

Installed in the Korea Chain Ganjeolgot Integrity Station

 

Station Output

  • 150KW

Antenna Height (H)

  • 137m

Address

  • 20, Cheongha-ro, Cheongha-myeon, Buk-gu, Pohang-si, Gyeongsangbuk-do
Pohang eLoran/Loran-C Station Facilities img